top of page

Waste to Energy MSW Plants

Projects developed in the Area of waste to Energy have always been received with great receptiveness for decades.

Client: CCENERGIA

Timeframe: 2023

Phases:

  • Preliminary studies

  • Tecnhology Supplier Procurement

  • Contract Terms

  • Support to Contract Negotiation

  • Commissioning

Project Details

Engineering and Procurement: Development of technical solution for energy recovery from biomass boiler through heat recovery from closed thermofluid circuit for dedicated eletricity production through Organic Rankine Cycle (ORC)

Joint meetings on the detailed Enginnering and executive Project phases. Supervision of the documentation presented by the manufacturers and respective specialty projects of the mechanical installations.

Main Data

  • Eletricity Production By Heat Recovery with ORC Technology

  • Production Capacity: 250 kWh

  • Project Invest.: 1.2 M€

Services

01

Technological Route

02

Feasability Studies

03

Supplier Identification and Evaluation

04

Proposal Evaluation

05

Support with Client Meetings

06

Comissioning Support

bottom of page