top of page
50 MW Dual-Fuel Power Plant (Kupang - Timor)
The power plant is designed to generate 50 MW of electricity using dual- fuel engines that can operate on both liquefied natural gas (LNG) and diesel.

Client: Valor Ambiente
Timeframe: 2015
Phases:
-
Technical analysis
-
Court witness

Project Details
Legal and technical evaluation study of status of the hazardous waste (hospital waste and animal by products) incineration facility at Madeira, participation in arbitration procedure, expert witness.

Main Data
-
WtE Hazardous Waste
Services
01
Expert Technical Assistance
bottom of page

.png)