top of page

Incineration Plant for Hazardous Hospital Waste (Portugal)

This project involves an Engineering, Procurement, and Construction (EPC) contract to ensure the successful design, construction, and operation of the facility.

Client: AMAL SGPS - Metal Constructions

Timeframe: 2014

Phases:

  • Preliminary studies Strategic planning

Project Details

The AMAL Group has initiated a project to develop an incineration plant for hazardous hospital waste in Portugal, with a processing capacity of 700 kg/h. This project involves an Engineering, Procurement, and Construction (EPC) contract to ensure the successful design, construction, and operation of the facility. The incineration plant is designed to safely and efficiently process hazardous hospital waste, reducing the environmental and health risks associated with improper disposal. The facility will utilize advanced incineration technology to ensure complete combustion of waste materials, minimising emissions and residues. This project represents a significant investment in sustainable waste management infrastructure in Portugal, aligning with national and international standards.

Main Data

  • Capacity: 700 kg/year

Services

01

Basic Engineering

02

Procurement Consulting

03

Negotiation

bottom of page