top of page

Arbitration of Waste Management Systems

Legal and technical evaluation study of status of the hazardous waste incineration facility at Madeira, participation in arbitration procedure, expert witness.

Client: A'Namaa Poultry Co.

Timeframe: 2019

Phases:

  • Preliminary studies

Project Details

The project aims to process 56.700 tons of poultry waste per year to generate electricity. This integrated solution combines a waste energy recovery plant, a photovoltaic plant, and a thermal plant with dual fuel engines. The key components are: Waste to Energy Plant, Photovoltaic Plant (18 MW), and Thermal Plant with Dual Fuel Engines (7 MW). The integrated approach ensures efficient processing of poultry waste and maximizes energy recovery. The project supports the Omani government's goals of enhancing food security and promoting renewable energy.

Main Data

  • Capacity: 57.600 ton/year (Poultry Litter)

  • Investment: 11M €

Services

01

Design, Project Development

02

Basic Engineering

03

Technical and Economic Feasibility Study

bottom of page