Installation for Separation and Recovery of Ferrous, Non- ferrous, and Inert from Slag (Madeira - Portugal)
The installation is designed to handle 26,000 tons of slag per year, produced from the waste incineration process.

Client: A'Namaa Poultry Co.
Timeframe: 2019
Phases:
-
Preliminary studies

Project Details
The project aims to process 56.700 tons of poultry waste per year to generate electricity. This integrated solution combines a waste energy recovery plant, a photovoltaic plant, and a thermal plant with dual fuel engines. The key components are: Waste to Energy Plant, Photovoltaic Plant (18 MW), and Thermal Plant with Dual Fuel Engines (7 MW). The integrated approach ensures efficient processing of poultry waste and maximizes energy recovery. The project supports the Omani government's goals of enhancing food security and promoting renewable energy.

Main Data
-
Capacity: 57.600 ton/year (Poultry Litter)
-
Investment: 11M €
Services
01
Design, Project Development
02
Basic Engineering
03

.png)