Mechanical and Biological Treatment (MBT) Center and for Thermoelectric Power Plant to Dual-Fuel of 50 MW. (Dakar - Senegal)
The project aims to enhance waste management and energy production in Dakar by integrating advanced waste treatment technologies with renewable energy generation.
%20Center%20and%20for%20Thermoelectric%20Power%20Plant%20to%20Dua.jpg)
Client: ARM – Águas e Resíduos da Madeira
Timeframe: 2019
Phases:
-
Preliminary studies
-
Executive Project
-
Tender Documents
-
Preliminary studies
-
Executive Project
-
Tender Documents

Project Details
The installation is designed to handle 26,000 tons of slag per year, produced from the waste incineration process. The primary goal is to efficiently separate and recover valuable metals and inert materials from the slag, reducing the amount of waste sent to landfills and promoting resource recycling. The key components and processes of the installation are: Initial Screening and Sorting, Magnetic Separation, Eddy Current Separation, Density Separation, Fine Particle Recovery. This optimized installation represents a significant advancement in waste management technology, promoting sustainable practices and contributing to environmental conservation.

Main Data
-
Capacity: 26.000 ton/year
-
Investment: 1M €