Incineration Plant for Hazardous Hospital Waste (Portugal)
This project involves an Engineering, Procurement, and Construction (EPC) contract to ensure the successful design, construction, and operation of the facility.
.jpg)
Client: Greentech
Timeframe: 2018
Phases:
-
EPC Contract Management

Project Details
The Greentech Angola project involves the installation of a 300 kWp photovoltaic (PV) system with battery support at a pharmaceutical storage center. This project aims to enhance energy efficiency and sustainability in the facility. The PV system with battery support ensures that the pharmaceutical storage center has a continuous and reliable power supply, which is crucial for maintaining the integrity of stored pharmaceuticals. The system is designed to be low-maintenance and highly efficient, providing long-term benefits to the facility

Main Data
-
Capacity: 300 kWp (PV)
-
Investment: 300.000 €
Services
01
Review of the implementation project
02

.png)