Integrated Waste Management System MUSAMI (Azores - Portugal)

Development of an integrated waste management system, known as the ECOPARQUE project.

Client: Greentech

Timeframe: 2018

Phases:

  • EPC Contract Management

Project Details

The Greentech Angola project involves the installation of a 300 kWp photovoltaic (PV) system with battery support at a pharmaceutical storage center. This project aims to enhance energy efficiency and sustainability in the facility. The PV system with battery support ensures that the pharmaceutical storage center has a continuous and reliable power supply, which is crucial for maintaining the integrity of stored pharmaceuticals. The system is designed to be low-maintenance and highly efficient, providing long-term benefits to the facility

Main Data

  • Capacity: 300 kWp (PV)

  • Investment: 300.000 €

Services

01

Review of the implementation project

02

Monitoring of the Project and Commissioning