top of page

Production of "Green" Energy Through Poultry Waste (Muscat - Oman)

The project aims to process 56.700 tons of poultry waste per year to generate electricity.

Client: Jacobsen Elektro

Timeframe: 2017 - 2019

Phases:

  • EPC Contract Management

Project Details

The power plant is designed to generate 50 MW of electricity using dual- fuel engines that can operate on both liquefied natural gas (LNG) and diesel. This flexibility ensures a reliable and continuous power supply, which is crucial for the region's energy needs. This project represents a significant step towards enhancing the energy infrastructure in Timor-East, contributing to the region's sustainable development goals.

Main Data

  • Capacity: 50 Mw (Dual Fuel)

Services

01

Design of basic and detail engineering

02

Due Diligence

03

Coordination of engineering teams

04

Budget Control

bottom of page