top of page

Maputo Sanitary Landfill and Closure of Hulene Dump (Maputo - Mozambique)

Tender for the Development of the Maputo Sanitary Landfill and Closure of Hulene Dump

Client: SULDOURO – Valorização e Tratamento de Resíduos Sólidos Urbanos, S.A.

Timeframe: 2020

Phases:

  • Preliminary studies

  • Preparation of Terms and Specifications for Consultation

Project Details

The MBT Unit is equipped with state-of-the-art technology to ensure efficient waste processing. The facility is designed to handle a large volume of waste, ensuring that the waste management needs of the Oporto area are met effectively. The work undertaken aimed to increase treatment capacity by replacing equipment in the mechanical treatment plant and by equipment in mechanical treatment and with the revitalization of Pulpers and accessory equipment in biological treatment.

Main Data

  • Investment: 2 M€

Services

01

Design, Project Development (Basic and Detail Engineering)

02

Procurement

03

Investment Analysis

04

Preparation of Tender Documentation

05

Evaluation of Proposals

bottom of page