top of page

Incineration Plant for Hazardous Hospital Waste (Portugal)

This project involves an Engineering, Procurement, and Construction (EPC) contract to ensure the successful design, construction, and operation of the facility.

Client: Valor Ambiente

Timeframe: 2015

Phases:

  • Technical analysis

  • Court witness

Project Details

Legal and technical evaluation study of status of the hazardous waste (hospital waste and animal by products) incineration facility at Madeira, participation in arbitration procedure, expert witness.

Main Data

  • WtE Hazardous Waste

Services

01

Expert Technical Assistance

bottom of page