50 MW Dual-Fuel Power Plant (Kupang - Timor)

The power plant is designed to generate 50 MW of electricity using dual- fuel engines that can operate on both liquefied natural gas (LNG) and diesel.

Client: AMBISOUSA

Timeframe: 2022 - Present

Phases:

  • Aplying to Tender

  • Project Analysis in the Construction Phase

  • Commissioning

Project Details

Development of proposal documents for the EPC tender for a Biological Anaerobic Digestion Treatment for Biogas production and subsequent production of Biomethane for Injection into the Public Natural Gas Network on behalf of the consportium BIANNA and ABB.

Procurement of Anaerobic Digestion companies and Negotiation of biogas production and waste treatment guarantees for the process.
Joint meetings on the detailed Enginnering and executive Project phases. Supervision of the documentation presented by the manufacturers and respective specialty projects of the mechanical installations.

Main Data

  • Anaerobic Biological Treatment for Organic Waste

  • Capacity: 25 000 ton/year

  • Project Invest.: 17 M€

Services

01

Market Research and Supplier Identification

02

Tender Strategy and Document Preparation

03

Preparation of Consultation Terms and Specifications

04

Evaluation and Negotiation of Proposals and Contracts

05

Advisory on the construction phase

06

Contractual and Technical Management