Photovoltaic Installation of 300 kWp, with battery support, in a Pharmaceutical Storage Center
(Luanda - Angola)

Installation of a 300 kWp photovoltaic (PV) system with battery support at a pharmaceutical storage center.

Client: ARM – Águas e Resíduos da Madeira

Timeframe: 2019

Phases:

  • Preliminary studies

  • Executive Project

  • Tender Documents

  • Preliminary studies

  • Executive Project

  • Tender Documents

Project Details

The installation is designed to handle 26,000 tons of slag per year, produced from the waste incineration process. The primary goal is to efficiently separate and recover valuable metals and inert materials from the slag, reducing the amount of waste sent to landfills and promoting resource recycling. The key components and processes of the installation are: Initial Screening and Sorting, Magnetic Separation, Eddy Current Separation, Density Separation, Fine Particle Recovery. This optimized installation represents a significant advancement in waste management technology, promoting sustainable practices and contributing to environmental conservation.

Main Data

  • Capacity: 26.000 ton/year

  • Investment: 1M €

Services

01

Design and Project Development

02

Executive Project

03

Technical and Economic Feasibility Study

04

Preparation of Terms and Specifications for Tender