Composting Sludge Valorisation Units in Castelo Branco and Évora (Portugal)

The project involves the development of sludge composting centers in Castelo Branco and Évora, each with a capacity to process 12,000 tons of waste sludge per year.

Client: Gibb Portugal

Timeframe: 2018

Phases:

  • Preliminary studies

Project Details

The project aims to enhance waste management and energy production in Dakar by integrating advanced waste treatment technologies with renewable energy generation. The MBT center will process municipal solid waste (MSW) to recover valuable materials and produce refuse-derived fuel (RDF), while the thermoelectric power plant will utilize both RDF and conventional fuels to generate electricity. The key components of the MBT center are: Waste Sorting and Separation, Biological Treatment, Refuse- Derived Fuel (RDF) Production, and the key components of the Thermoelectric Power Plan are: Dual-Fuel Engines and Electricity Generation. This project represents a comprehensive approach to waste management and renewable energy production.

Main Data

  • Capacity: 300.000 ton/year (MSW)

  • Eletricty Production: 394.000 MWh/year

  • Investment: 180M €

Services

01

Design design and project development (basic and detail engineering)

02

Establishment of partnerships

03

Technical and economic feasibility studies

04

Preparation of terms of consultation and specification

05

Evaluation and negotiation of proposals and contracts for supply, installation, and maintenance

06

Contract management & Planning and control of costs, budgets, and budgeting