Arbitration of Waste Management Systems
Legal and technical evaluation study of status of the hazardous waste incineration facility at Madeira, participation in arbitration procedure, expert witness.

Client: Jacobsen Elektro
Timeframe: 2017 - 2019
Phases:
-
EPC Contract Management

Project Details
The power plant is designed to generate 50 MW of electricity using dual- fuel engines that can operate on both liquefied natural gas (LNG) and diesel. This flexibility ensures a reliable and continuous power supply, which is crucial for the region's energy needs. This project represents a significant step towards enhancing the energy infrastructure in Timor-East, contributing to the region's sustainable development goals.

Main Data
-
Capacity: 50 Mw (Dual Fuel)
Services
01
Design of basic and detail engineering
02
Due Diligence
03
Coordination of engineering teams
04
Budget Control