top of page

Client: Lipor

Timeframe: 2024

Phases: Bid Evaluation

Project Details

Engineering and Tender Management: Support to the Team led by SUMA and PREZERO consortium, in the preparation of the Memories and documentation of the technical proposal in the components of Maintenance Operations, Equipment Operation, Quantification of the needs of Spare Parts, Equipment Replacement and Proposals for Improvements to the Installation.

Integration of the above-mentioned Memories into the overall proposal of the SUMA and PreZero Consortium in a single proposal, including active participation in the work, coordination and closing meetings.

Main Data

  • WtE with 2 Lines (200.00 ton/year/each) MSW

  • O&M of WtE (MSW)

  • Contract Duration: (10+5) Years

  • Contract Value: 300 M€

Services

01

Market Research and Supplier Identification

02

Tender Strategy and Document Preparation

03

Technical and Economic Feasibility Studies

04

Preparation of Consultation Terms and Specifications

05

Evaluation and Negotiation of Proposals and Contracts

06

Contractual and Technical Management

Production of "Green" Energy Through Poultry Waste (Muscat - Oman)

The project aims to process 56.700 tons of poultry waste per year to generate electricity.

bottom of page