top of page

50 MW Dual-Fuel Power Plant (Kupang - Timor)

The power plant is designed to generate 50 MW of electricity using dual- fuel engines that can operate on both liquefied natural gas (LNG) and diesel.

Client: Valor Ambiente

Timeframe: 2015

Phases:

  • Technical analysis

  • Court witness

Project Details

Legal and technical evaluation study of status of the hazardous waste (hospital waste and animal by products) incineration facility at Madeira, participation in arbitration procedure, expert witness.

Main Data

  • WtE Hazardous Waste

Services

01

Expert Technical Assistance

bottom of page