50 MW Dual-Fuel Power Plant (Kupang - Timor)
The power plant is designed to generate 50 MW of electricity using dual- fuel engines that can operate on both liquefied natural gas (LNG) and diesel.

Client: ARM – Águas e Resíduos da Madeira
Timeframe: 2019
Phases:
-
Preliminary studies
-
Executive Project
-
Tender Documents
-
Preliminary studies
-
Executive Project
-
Tender Documents

Project Details
The installation is designed to handle 26,000 tons of slag per year, produced from the waste incineration process. The primary goal is to efficiently separate and recover valuable metals and inert materials from the slag, reducing the amount of waste sent to landfills and promoting resource recycling. The key components and processes of the installation are: Initial Screening and Sorting, Magnetic Separation, Eddy Current Separation, Density Separation, Fine Particle Recovery. This optimized installation represents a significant advancement in waste management technology, promoting sustainable practices and contributing to environmental conservation.

Main Data
-
Capacity: 26.000 ton/year
-
Investment: 1M €
Services
01
Design and Project Development
02
Executive Project
03
Technical and Economic Feasibility Study
04