top of page

Incineration Plant for Hazardous Hospital Waste (Portugal)

This project involves an Engineering, Procurement, and Construction (EPC) contract to ensure the successful design, construction, and operation of the facility.

Client: Greentech

Timeframe: 2018

Phases:

  • EPC Contract Management

Project Details

The Greentech Angola project involves the installation of a 300 kWp photovoltaic (PV) system with battery support at a pharmaceutical storage center. This project aims to enhance energy efficiency and sustainability in the facility. The PV system with battery support ensures that the pharmaceutical storage center has a continuous and reliable power supply, which is crucial for maintaining the integrity of stored pharmaceuticals. The system is designed to be low-maintenance and highly efficient, providing long-term benefits to the facility

Main Data

  • Capacity: 300 kWp (PV)

  • Investment: 300.000 €

Services

01

Review of the implementation project

02

Monitoring of the Project and Commissioning

bottom of page