top of page

Incineration Plant for Hazardous Hospital Waste (Portugal)

This project involves an Engineering, Procurement, and Construction (EPC) contract to ensure the successful design, construction, and operation of the facility.

Client: MUSAMI

Timeframe: 2010 - Present

Phases:

  • Preliminary studies

  • Strategic planning

  • Construction

Project Details

The MUSAMI project on São Miguel Island in the Azores is an ambitious initiative aimed at improving waste management and environmental sustainability. The project involves the development of an integrated waste management system, known as the ECOPARQUE project. This system includes various infrastructures designed to handle different types of waste and improve overall waste management efficiency: Waste to Energy Plant, Material Recovery Facility, Biological Treatment Centre, Leachate Treatment Plant, Landfill Sites. The project aims to reduce the amount of waste sent to landfills, increase recycling rates, and generate energy from non-recyclable waste.

Main Data

  • Mechanical and Biological Treatment with processing capacity 60.000 ton/year MSW (4.5M€+6.5m€)

  • Landfill for MSW, Ash and Slag (1.3M€+2.8M€)
    Waste to Energy Plant, capacity 20 MWth, Multifuel Plant (MSW, Slaughterhouse

  • Waste and Industrial Waste) (57M€)

Services

01

Concept development and sizing

02

Basic Engineering

03

Feasibility Studies

04

Evaluation of Commercial Proposals

05

Preparation of Contract Terms

bottom of page