top of page

Mechanical Biological Treatment (MBT) Center for the Selective Collection of Municipal Solid Waste of Porto Area (Portugal)

The work undertaken aimed to increase treatment capacity by replacing equipment in the mechanical treatment plant and by equipment in mechanical treatment and with the revitalization of Pulpers and accessory equipment in biological treatment.

Client: Jacobsen Elektro

Timeframe: 2017 - 2019

Phases:

  • EPC Contract Management

Project Details

The power plant is designed to generate 50 MW of electricity using dual- fuel engines that can operate on both liquefied natural gas (LNG) and diesel. This flexibility ensures a reliable and continuous power supply, which is crucial for the region's energy needs. This project represents a significant step towards enhancing the energy infrastructure in Timor-East, contributing to the region's sustainable development goals.

Main Data

  • Capacity: 50 Mw (Dual Fuel)

Services

01

Design of basic and detail engineering

02

Due Diligence

03

Coordination of engineering teams

04

Budget Control

bottom of page