top of page

Mechanical Biological Treatment (MBT) Center for the Selective Collection of Municipal Solid Waste of Porto Area (Portugal)

The work undertaken aimed to increase treatment capacity by replacing equipment in the mechanical treatment plant and by equipment in mechanical treatment and with the revitalization of Pulpers and accessory equipment in biological treatment.

Phases: Development and Contruction

Project Details

Projects developed in the Area of waste to Energy have always been received with great receptiveness for decades.
Since then, we have developed and monitored the construction of incineration solutions tailored to the needs of the area where the waste is produced and where this solution is effective and energy efficient. The examples presented are proof that even in cities it is possible to build these units with a minimum impact on the surroundings.

Main Data

  • 1- Location: Spittelau, Austria, Capacity: Electric Production: 40 MW, Steam Production 100 ton/h @32bar,240oC, Year: 1989/2013

  • 2 - Location: Lenzing, Upper Austria, Capacity: Electric Production: 16 MW, Steam Production 120 ton/h @80bar,500oC, Year: 1998

  • 3- Location: Linz, Austria, Capacity: Electric Production: 12MW, Steam Production: 80 ton/h, Year: 2012

  • 4- Location: Niklasdorf, Austria, Capacity: Electric Production: 7 MW, Steam Production: 46 ton/h @40bar,400oC, Year: 2003

Services

01

Feasibility studies

02

Technical concept, Basic and Detailed Engineering

03

Supervision of Project Stage and Erection Works

04

Supervision of environmental impact study and legalisation projects

bottom of page