Incineration Plant for Hazardous Hospital Waste (Portugal)

This project involves an Engineering, Procurement, and Construction (EPC) contract to ensure the successful design, construction, and operation of the facility.

Client: Maputo Municipal Council

Timeframe: 2023 - Now

Phases:

  • Preliminary studies

  • Technological Route

  • Economical and Tecnhical Evaluation

  • Logistic Studies for Waste Transportation

  • Executive Project

  • Tender Documents

Project Details

Engineering and Tender Management: Support to the Team led by GOPA and TPF consortium, on the Design of the Project, Memories and documentation for the new Landfill of Katembe and Hulene Closure. Revision of the Maputo Municipal Solid Waste Management Master Plan. Development of new forecast for the next 30 years for the Waste production on the Maputo City.

Review of the Maputo Municipal Solid Waste Management Master Plan and Development of a new forecast for the next 30 years for waste production in the City of Maputo.
Both landfills will include the use of biogas produced for energy recovery, via combustion engines to produce electricity for injection into the Public Grid, or for Biomethane production and supply to collection trucks.

Main Data

  • WtE with 2 Lines (200.00 ton/year/each) MSW

  • O&M of WtE (MSW)

  • Contract Duration: (10+5) Years

  • Contract Value: 300 M€

Services

01

Market Research and Supplier Identification

02

Tender Strategy and Document Preparation

03

Technical and Economic Feasibility Studies

04

Preparation of Consultation Terms and Specifications

05

Evaluation and Negotiation of Proposals and Contracts

06

Contractual and Technical Management